СП "Укрхозимпекс". ТМ "Пионер": г. Киев, 03040,
Голосеевская площадь, ул.Васильковская 1, 4 корпус, 2 этаж
Телефоны 257-50-24, 257-50-25, 257-50-26
Forgotten password? new user registration
UA/ RU/ EN
СП "Укрхозкомплекс" пропонує
професійне устаткування
для вирішення питання робіт на висоті
-->
The scaffolding build
Mobile scaffolding-towers, falsework
Lifts
Stairs of ZARGES
Planking
Containers
Logistic equipement
Other

NEW!

Planking is a foam plastic for square columns

 

 

Price after 1 a meter is linear 31,67 €



 

 
Cart is empty, put in it something from here.
  
The scaffolding build / Frame scaffolding / max 100m

back Инструкция Галерея

 

    The frame scaffolding consist of bars, done as "П"- of vivid frames, connected by the horizontal and diagonal gatherings. It is the most perfect and comfortable construction from point of speed of editing, reliability and economy. 

    The frame forests most befit for linear facades, but due to plenty of additional elements (cantilevers, farms and etc), it is possible easily to equip the object of any complication these scaffolding.

    For editing of the frame scaffolding the special preparation of fitters is not needed – to due to the fixed location of fixings-locks, all of geometrical parameters of the scaffolding are folded automatically. Also some instruments are not needed for assembling, because screw-thread connections, klinove locks, absent in a construction, shallow elements etc   
   The frame forests are the most widespread scaffolding in Europe

.



  Frame scafolding
Maximal height, m 60 (100 по спец. проекту)
Normative superficial loading, кgs/m2 200
Amount of the loaded tiers 2 (1 по спец. проекту)
Step of tier on a height, m 2,1
Step along a wall, m 2,0; 2,5; 3,0
Width of tier, m 0,75; 1,09
Articul ЛС-70/100
Price
90

НАША ПРОДУКЦИЯ:


   

  

  

 

 

  

  


 

 
АКЦИОННЫЕ ТОВАРЫ:

ГАЙКА ОПАЛУБОЧНАЯ 90мм

9 грн./шт.

81 грн./шт.

 

 

 

 

 

 

 

 

 

 

 

 

 

Дизайн А.Суханова

KaktusCMS